Radiant and snowmelt for builders and remodelers
Serving the Salt Lake Valley, Park City, Heber and Midway
We lay out the loops, pressure-test before the pour and work to your schedule. Hydronic heat for new builds and remodels across three counties.
Do you install radiant and snowmelt for builders?
Yes. Boiler Buzz designs and installs hydronic radiant floors, snowmelt and boilers for new construction and remodels. We lay out the loops, pressure-test the tubing before the pour, then set the boiler, pumps and controls and start it up.

What we handle on a build
Design and layout
Heat loss, loop layout, manifold locations and boiler sizing, drawn before you frame.
- Room-by-room heat loss
- Loop and zone layout
- Boiler or heat pump sizing
Rough-in
Tubing, manifolds and sleeves set to your schedule, then pressure-tested before the pour.
- PEX tubing and manifolds
- Pressure test before concrete
- Snowmelt in drives, walks and steps
Finish and startup
Boiler, pumps, controls and glycol set, fired and walked through with the owner.
- Boiler, pumps and controls
- Glycol fill for snowmelt
- Startup and owner walkthrough
How a build works with us
- 1PlansSend plans early. Before framing is best.
- 2Layout and quoteLoop layout, equipment and a written price.
- 3Rough-inTubing and manifolds set around your schedule.
- 4Pressure testEvery loop tested before the pour.
- 5Boiler and controlsSet after the pour and the mechanical room are ready.
- 6StartupFired, balanced and shown to the owner.
What builders say
“By far the most knowledgeable HVAC guy I know. And I build homes for a living and do remodel work.”
“Pete's knowledge and attention to detail are second to none. I have worked with him on numerous jobs and am always impressed.”
Recent tubing work



Send us your plans
Tell us about the project and attach the plans. We come back with questions, a layout and a written price.
- 1Send plansPDF or photos are fine.
- 2We reviewHeat loss, loops and equipment.
- 3Layout and priceIn writing, before you commit.
Thanks. Your project is on its way to Pete.
He'll look over the plans and come back with questions, a layout and a written price. Need him sooner? Call (435) 800-5047.
Builder questions
When should we bring you in?
At the plans stage, before framing if you can. Loop layout and boiler location are easier to get right early.
Do you pressure-test before the pour?
Yes. Every loop is pressure-tested before concrete goes in, so a damaged tube is found while it can still be fixed.
Can you work around our schedule?
Tell us your framing and concrete dates. We plan the rough-in and the pressure test around them.
Do you do remodels and additions?
Yes. We add radiant zones and snowmelt in remodels and tie them into the existing boiler when it has room.